3D system for drill rigs

Leica iCON iRD3

3D · GPS3D · Total station

The drilling plan goes straight to the cab display, and the system guides the operator to the next hole and helps align the mast to the set angle and direction. Drilled holes are logged automatically.

Bušilica s Leica iCON iRD3 sustavom
Zaslon Leica MCP80Leica MCP80 display
Type of guidance3D, to the digital design
DisplayLeica MCP80
Position2 GNSS antennas on the body or towerTotal station · 2 prisms
ConnectivityLeica ConX
01 System description

The drilling plan goes straight to the cab display, and the system guides the operator to the next hole and helps align the mast to the set angle and direction. Drilled holes are logged automatically.

GNSS antennas on the body or mast of the drill rig, with sensors on the boom, stick and mast. Dual configuration with prisms, when the satellite signal is not sufficient. The design arrives via the Leica ConX cloud, and the same MCP80 display works on all Leica iCON machines.

Video
02 Downloads
    03 How it works
    Shown for

    How
    works

    Four steps from design to finished job. The steps change automatically, and you can click any of them.

      To the hole1.70 m
      Accuracycentimetre-level
      04 System components
      Shown for

      Components
      systems

      Hover over the numbers on the machine to see what each part does.

        05 Working mode comparison

        Comparison
        working modes

        Both modes work to the same 3D design. The difference is where the system gets the machine position from.

        06 Special features

        Displays tailored to
        drilling

        The operator chooses the start screen to suit the job, in day or night mode.

        Cylindrical view

        Green: drilled. Red: failed hole. White: holes still to be drilled.

        Split view

        Perspective and cylinders together: drilling with a constant view of the navigation.

        Dual “bull’s eye”

        Navigation of the top and bottom of the hole, for an angled hole at the planned angle.

        07 Workflow

        Always under
        control

        From design to as-built, all on the cab display and in Leica ConX.

        1. Before work

          Drilling plan

          • The plan arrives via Leica ConX or iCON site
          • Or create it on the display
          • You choose the start view
        2. During work

          Drilling

          • Navigation to the nearest hole
          • Aligning the mast to the angle
          • Day and night view
        3. After work

          As-built

          • Every hole recorded
          • Sharing via Leica ConX
          • No drilling in old holes
        08 Moving the equipment
        Shown for

        One system,
        more machines

        Every machine is fitted with the preparation kit: brackets, cables and sensors. You then move the equipment for the chosen working mode from this machine to other machines with the preparation kit.

        BušilicaDrill rig · preparation kit

        Your investment in one machine also serves another: the same display, software and Leica ConX on all machines.

        09 Benefits

        What you get

        Time

        • No hole stakeout
        • Automatic navigation to the next hole

        Accuracy

        • Complex plans and directional drilling
        • No drilling in old holes

        Connected

        • Wireless project updates and support
        • Connection to the machine manufacturer's computer

        Savings

        • Big savings in time and costs
        • One solution for drilling and pile driving
        10 Why Leica iCON

        Why 3D
        drill rig?

        Staking out every hole takes time, the marks disappear under the machine, and the operator estimates the mast angle by eye.

        With stakeout

        Surveyor in front of the machine

        R1R2R3
        1. Stake out every hole
        2. Find the mark
        3. Aligning the mast by eye
        4. Write down by hand
        Marks disappearWrong hole angleDrilling in an existing holeNo records
        3D drill rig

        Navigation to the hole

        Zaslon Leica MCP80
        1. Load the drilling plan
        2. Switch on the GPS
        3. Follow the arrows to the hole
        4. Drill and log
        No stakeoutExact angle and directionA record of every holeDirectional drilling

        Want to see it
        on your machine?

        Book a presentation →← Back to drill rig