Home/Machines/Drill rig
Drill rig machine control

Drillingwithoutstakeout.

The drilling plan goes straight to the cab display, and the system guides the operator to the next hole and helps align the mast to the set angle and direction. Drilled holes are logged automatically.

Bušilica s Leica sustavom za automatizaciju

Why 3D
drill rig?

Staking out every hole takes time, the marks disappear under the machine, and the operator estimates the mast angle by eye.

With stakeout

Surveyor in front of the machine

R1R2R3
  1. Stake out every hole
  2. Find the mark
  3. Aligning the mast by eye
  4. Write down by hand
Marks disappearWrong hole angleDrilling in an existing holeNo records
3D drill rig

Navigation to the hole

Zaslon Leica MCP80
  1. Load the drilling plan
  2. Switch on the GPS
  3. Follow the arrows to the hole
  4. Drill and log
No stakeoutExact angle and directionA record of every holeDirectional drilling

How do you want
work?

First choose a working mode. Everything below, up to the comparison, applies only to your choice.

↓ The content below unlocks when you choose a working mode
Shown for:
First choose a working mode

The content differs depending on the chosen working mode.

Shown for

How
works

Four steps from design to finished job. The steps change automatically, and you can click any of them.

    To the hole1.70 m
    Accuracycentimetre-level

    See
    how it works

    Video
    Shown for

    Components
    systems

    Hover over the numbers on the machine to see what each part does.

      Comparison
      working modes

      Both modes work to the same 3D design. The difference is where the system gets the machine position from.

      Displays tailored to
      drilling

      The operator chooses the start screen to suit the job, in day or night mode.

      Cylindrical view

      Green: drilled. Red: failed hole. White: holes still to be drilled.

      Split view

      Perspective and cylinders together: drilling with a constant view of the navigation.

      Dual “bull’s eye”

      Navigation of the top and bottom of the hole, for an angled hole at the planned angle.

      Always under
      control

      From design to as-built, all on the cab display and in Leica ConX.

      1. Before work

        Drilling plan

        • The plan arrives via Leica ConX or iCON site
        • Or create it on the display
        • You choose the start view
      2. During work

        Drilling

        • Navigation to the nearest hole
        • Aligning the mast to the angle
        • Day and night view
      3. After work

        As-built

        • Every hole recorded
        • Sharing via Leica ConX
        • No drilling in old holes
      Shown for

      One system,
      more machines

      Every machine is fitted with the preparation kit: brackets, cables and sensors. You then move the equipment for the chosen working mode from this machine to other machines with the preparation kit.

      BušilicaDrill rig · preparation kit

      Your investment in one machine also serves another: the same display, software and Leica ConX on all machines.

      What you get

      Time

      • No hole stakeout
      • Automatic navigation to the next hole

      Accuracy

      • Complex plans and directional drilling
      • No drilling in old holes

      Connected

      • Wireless project updates and support
      • Connection to the machine manufacturer's computer

      Savings

      • Big savings in time and costs
      • One solution for drilling and pile driving

      Want to see it
      live?

      Book a presentation on your site, and we will propose a configuration for your machine.

      Book a presentation →Take the questionnaire