Concretewithoutstringline.
You load the 3D design (digital stringline) into the paver display and off you go. The system controls the mould height, slope and direction by itself, for roads, runways, tunnels, curbs and channels.

Why work
without a stringline?
The stringline is slow and error-prone. It needs surveyors and days of preparation, it gets in the way of trucks, and it is often damaged or set up wrongly.
Preparation days
- Mark the pin positions
- Drive in the pins
- Stake out heights
- Set up and tension the stringline
Start right away

- Create the 3D design (digital stringline)
- Load it into the paver display
- Set up the total station anywhere along the route
- Pave concrete
How do you want
work?
First choose a working mode. The machine position comes from total stations or GNSS antennas. Everything below, up to the comparison, applies only to your choice.
The content differs depending on the chosen working mode.
How
works
Four steps to concrete to design. The steps change automatically, and you can click any of them.
See
how it works
Components
systems
Hover over the numbers on the machine to see what each part does.
Comparison
working modes
Both modes control the height, slope and direction of the mould to the same digital stringline. The difference is where the system gets the machine position from.
Always under
control
From loading the design to the as-built document, all on the cab display and in Leica ConX.
- Before concrete paving
Preparation kit
- The digital stringline arrives via Leica ConX
- You choose the reference line and slope
- Set up the total stations
- During concrete paving
Concrete paving
- Follow material flow in automatic
- Quick nudge with display buttons
- Automatic leapfrog stations
- After concrete paving
Quality control
- The system records by itself built concrete
- Track progress from the office
- Saved to USB or Leica ConX
One system,
more machines
Every machine is fitted with the preparation kit: brackets, cables and sensors. You then move the equipment for the chosen working mode from the concrete paver to an asphalt paver, milling machine, curb paver or grader.
Concrete paver · preparation kit
Your investment in one machine also serves another: with the same data and equipment you pour concrete, pave, mill and grade.
What you get
Savings
- No setting up stringline or pins
- Less material, exactly to design
- Fast installation and setup
Time
- No waiting for pins to be staked out
- Uninterrupted work with automatic leapfrog
- The same data as on other iCON machines
Accuracy
- Consistent, highly precise concrete paving quality
- Curves exactly to the design radius
- More sensor combinations for every job
Security
- Less risk on site
- Nobody walks along the stringline or trips over it
Want to see it
live?
Book a presentation on your site or send us your design, and we will propose a configuration for your concrete paver.