Asphaltwithoutstringline.
You load the 3D design (digital stringline) into the paver display and off you go. The system controls the screed height and slope by itself, and the surface is accurate in the first pass, even in curves.

Why work
without a stringline?
The stringline is slow and error-prone. It needs surveyors and days of preparation, it gets in the way of trucks, and it is often damaged or set up wrongly.
Preparation days
- Mark the pin positions
- Drive in the pins
- Stake out heights
- Set up and tension the stringline
Start right away

- Create the 3D design (digital stringline)
- Load it into the paver display
- Set up the total station anywhere along the route
- Pave
How do you want
work?
First choose a working mode. In both cases the screed height comes from a total station; the difference is how the system knows the paver heading.
The content differs depending on the chosen working mode.
How
works
Four steps to asphalt to design. The steps change automatically, and you can click any of them.
See
how it works
Components
systems
Hover over the numbers on the machine to see what each part does.
Comparison
working modes
The system supports several total stations at the same time. The number of stations shown is a practical configuration for uninterrupted work, not a system limit.
Always under
control
From loading the design to the as-built document, all on the cab display and in Leica ConX.
- Before paving
Preparation kit
- The digital stringline arrives via Leica ConX
- You choose the reference line
- Customise the display view
- During paving
Paving
- Monitor the work on the cab display
- The backup station checks as-built
- Automatic leapfrog stations
- After paving
Quality control
- The system records the as-built by itself
- Track progress from the office
- As-built document
One system,
more machines
Every machine is fitted with the preparation kit: brackets, cables and sensors. You then move the equipment for the chosen working mode from the paver to a milling machine, concrete paver, curb paver or grader.
Asphalt paver · preparation kit
Your investment in one machine also serves another: with the same data and equipment you pave, mill, pour concrete and grade.
What you get
Savings
- No stringline work: pave anywhere, any time
- Less material, no excess milling or paving
- Easier and faster material delivery
Time
- No waiting for pins to be staked out
- The paver is ready as soon as you load the design
- Change the design at any time, without problems
Accuracy
- You do not depend on how accurately the stringline was set
- Consistent quality, 0–24
- Curves exactly to the design radius
- Lower road maintenance costs
Security
- Less risk on site
- Nobody walks along the stringline or trips over it
Where the paver sits
on the road?
The lower layers are levelled by dozers, graders and rollers with GPS. From the base course upwards millimetre accuracy is required, so the height comes from a total station.
Stories from
sites
Leica 3D paving on motorways, airports and in tunnels, from Turkey to Norway and Iceland.
Want to see it
live?
Book a presentation on your site or send us your design, and we will propose a configuration for your paver.